
Almost complete! Just need to lay the 24x24" pavers to create the pathway, edging stones for the flower beds and the 12x12" pavers for the tote storage. That will be this upcoming weekends project!

The start of the 25 yards of soil we had to spread before SOD was layed. Do you realize how many wheelbarrow loads after wheelbarrow loads that was? One too many!

Burying 75' of electrical wire. This will power our fountain and outdoor lights.

The side yard before landscaping and Nolan digging in the rocks. We had to shovel out all the drain gravel that was placed as part of our landscaping when we moved in to prepare for the soil to be hauled in.